For Construction & contractors
The overrun that shows up in month four was visible in month one. Brainis shows it in month one.
The instrument
Construction & contractors · company state
schematicDrag sideways to see the rest
7 JOBS LIVE · 2 DRIFTING BEYOND THE PREDICTED RANGE
A schematic of the surface, not a screenshot.
The problem
The suite
What it runs
Worked example
Committed cost against the bid, checked continuously, with the drift surfaced while it is still fixable.
Track committed cost against the bid per line
Flag lines drifting beyond the predicted range
Assemble the evidence and the options
Decide - absorb, change order, or renegotiate
Draft the change order
Approve anything that goes to the client
Every actor is labeled. The steps marked you are the calls Brainis routes to a human; the mission carries the authority for the rest.
Connect
Connect the minimum your objective needs - not everything you have. See the whole catalog
Status labels come from the live connector catalog.
Autonomy
Tracking and drafting at L5. Change orders, client communication and any commitment of money stay with you.
Hard question
Nearby